Case Studies
River Tale
Specialist Plant and pontoons for scour protection works
The team was mobilised to undertake essential scour remediation works at the River Tale, adjacent to a brick railway bridge. The primary task involved placing sixteen tonnes of rock into a substantial scour hole to reinforce the riverbed and protect the bridge structure.
River Wey, Godalming
Rail Bridge Inspection Pontoon
The survey pontoon set-up consisted of a five metres by four metres modular Versadock pontoon, with our usual personnel edge protection consisting of demountable metal panels and post and rope rails for access. Added to this were our lightweight aluminium spud legs for easy anchoring and a Rigiflex push boat.
River Arun
Rail Bridge Survey from Pontoons & Boats
Tasked with providing a safe working platform for survey work to take place, reaching the underside of Ford railway bridge was problematic enough. The added fact that it also has a tidal range between three and five metres, accessing the bridge structure was not going to be easy.